2013 / Romania
Client: EDP Renováveis

Specifications

The project consists of 9 x 630 kW plants and 6 x 500 kW AC plants, with a total peak power of 9.37 MW and connected in the town’s CEZ substation. It was built in complete EPC mode, with a 245 W SUNTECH brand polycrystalline plate mounted on a fixed structure designed and manufactured by TSK. The structure is designed to withstand heavy loads of snow. It is the first photovoltaic plant TSK has built in Rumania. The plant was connected to the grid and commissioned in March 2013.

Location