2019 / Cochabamba (Bolivia)
Client: Ende Transmisión

Specifications

Scope of Work: EPC

500 KV Part: Configuration Switch and a half:
• Two single-phase autotransformers banks of 500/230 kV, 3x150 MVA + reserve
• Two 500 kV transformer bays, switch and half configuration.
• Two 500 / V3 kV Shunt reactors banks single-phase (fixed and variable)
• 500 kV line bay, switch and a half configuration
• 500 KV reactor bay
• 500 KV reactor bay of bar, simple bar configuration 

230 KV Part: Double Bar Configuration
• 230 Kv extension bars, double bar configuration with by pass switch: 6 circuits connection
• Two 230 KV transformer bays, double busbar configuration with bypass disconnector.

Location